Good Evening, James

JH

Maintenance

Maintenance and repair jobs reported by tenants, owners and inspections, with contractors, costs and progress.

Overview

Jobs

10

Open

8

Emergency

1

Awaiting approval

1

Maintenance and repairs
  • 48 Station Road

    Boiler leaking into the airing cupboard, heating and hot water switched off.

    Boiler · Emergency · 03 Sep 2026

    In progress
  • 5 Willow Lane

    Slipped tiles above the rear bedroom causing water ingress and ceiling staining.

    Roofing · High · 14 Aug 2026

    Contractor required
  • 16 Oakfield Road

    Damp patch on the rear bedroom external wall.

    Damp · Normal · 25 Jul 2026

    Appointment booked
  • 22 Elm Grove

    Fire door self-closer on room 3 slow to latch.

    Joinery · High · 04 Aug 2026

    Completed
  • Flat 6, Millbrook House

    Hallway redecoration before the next tenancy.

    Decoration · Normal · 18 Aug 2026

    Appointment booked
  • Riverside Court

    Communal stair light failing intermittently.

    Electrical · Normal · 25 Aug 2026

    Appointment booked
  • 48 Station Road

    Kitchen door split at the lower panel — tenant recharge agreed.

    Joinery · Low · 06 Apr 2026

    Completed
  • Larch House

    Full refurbishment — kitchen and bathroom replacement.

    General · Normal · 20 Jul 2026

    In progress
  • Bramble Cottage

    Overgrown hedge at the front boundary.

    Garden · Low · 28 Aug 2026

    Awaiting owner approval
  • Unit 3, Quarry Trade Park

    Roller shutter sticking when closing.

    Locks/security · Normal · 01 Sep 2026

    Awaiting review